ADVANCED Motion Controls: EtherNet/IP Now Available for FlexPro Servo Drives

April 16, 2021

With the release of two new products, not only have ADVANCED Motion Controls (AMC) added panel mount servo drives to their FlexPro family, but they’ve also added Ethernet/IP to their growing list of supported network protocols at ADVANCED Motion Controls.

The FMP060-25-IPM is the first of their off-the-shelf standard products to have EtherNet/IP communication, but it certainly won’t be their last.

Most servo drives and controls on the market that use EtherNet/IP are designed to operate at higher voltages such as 220VAC. However, AMC’s new FlexPro drives run on just 10-55 VDC, making low voltage/high power options available to EtherNet/IP users.

These new FlexPro drives are perfectly suited for manufacturing applications, robotics, and warehouse automation. Their lower operating voltage and high output current expands the options that were previously unavailable when creating new designs with EtherNet/IP. The panel mount form factor makes integration, maintenance, and even retrofitting hassle-free.

Also available in the panel mount form factor is the FMP060-25-EM with EtherCAT communication.

Source

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • Designing Resilient Data Center Power with VPI and Cast Resin Technologies

    August 25, 2026 The race to build high-density data centers for AI, machine learning, and cloud computing has put immense pressure on engineering teams to balance two critical priorities: absolute operational uptime and predictable project schedules. In this industry, a slipped commissioning date can mean millions in lost revenue. When designing electrical infrastructure, it is… Read More…

  • Sustainability: Schneider Electric Was Doing It Before It Was Cool

    August 21, 2026 By Krystie Johnston Schneider Electric was recently named the “World’s Most Sustainable Company 2026” by TIME Magazine and Statista again. For the third consecutive year. Since the magazine and data firm started the ranking in 2024. They topped the list of 750 of the world’s largest and most influential companies for sustainability… Read More…