Electric Motor Systems Technician Trade being Removed from Red Seal Program

March 10, 2020

In November 2019, the CCDA reached consensus on a decision to remove the Red Seal status of the Electric Motor Systems Technician trade. This decision was made following a two-year review period and was based on a number of indicators, including low usage of the trade’s Red Seal products across Canada over several years.

Please note that the inclusion of a trade in the Red Seal Program is separate from any provincial or territorial decision around designating that trade. All Red Seal examinations will be deactivated as of June 1, 2020, after which Red Seal endorsements will no longer be issued.

If you have any questions you can visit HERE.

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • Case Study: Optimizing Harmonic Mitigation in Wastewater Treatment

    June 22, 2026 Segment and Application In a municipality, wastewater treatment plants typically stand out as the main consumers of electricity. The operational processes exhibit significant load variations throughout a 24-hour cycle, necessitating the use of AC drives to regulate pumps, blowers, and other motorized equipment in response to fluctuating demand. In one wastewater treatment… Read More…

  • Why Do Mission-Critical Facilities Need Seismic-Rated Server Racks?

    June 17, 2026 When organizations think about seismic preparedness, they typically focus on buildings, backup generators, and emergency response plans. However, one critical component is often overlooked: the rack supporting the network infrastructure. For hospitals, emergency operations centers, municipal facilities, utilities, and public safety agencies, network connectivity is essential during and after a seismic event.… Read More…