Keep it De-Energised with PNOZ s60 from Pilz

Pilz pnozs60 400

April 25, 2019

With the safe voltage monitor PNOZ s60 Pilz now offers monitoring of the de-energised state of plant and machinery to the standard UL 6420. This makes PNOZ s60 suitable for use in applications that require a Safety Lockout System (SLS), that is, when plants are held in a safe, electrically de-energised state.
 
The safe voltage monitor PNOZ s60 completes the safety relay PNOZsigma product group and fulfils the requirements for the implementation of SLS applications as prescribed by law in the USA. PNOZ s60 monitors de-energised 1-phase or 3-phase supplies with neutral conductor. Two switching thresholds can be set: 12 V or the 6 V common in the food and beverage sector. The safety circuit is not enabled until the value is below the configured switching threshold.
 
With a supply voltage of 24-48/110-240 VAC/DC the safe voltage monitor PNOZ s60 is particularly flexible and can be used in a wide range of applications. Expanded diagnostics via LEDs increases productivity as it enables users to perform simple diagnostics and supports them when troubleshooting. The compact 90 mm width enables a space-saving and therefore cost-effective installation in the control cabinet.
 
Go HERE for more infomation

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • NOARK’s Breakthrough in AI Data Centers: A Story of Speed, Strategy, and Execution

    May 19, 2026 In November 2025, NOARK Electric was presented with an opportunity that would test not only its capabilities, but its agility, coordination, and decision-making under pressure. A global technology and social media company—rapidly expanding its AI infrastructure—issued a request for quotation for pad-mounted transformers and switchboards. The scope was significant: a multi-million-dollar order tied to Read More…

  • State of the Data Center Boom 2026: Why Power Infrastructure Now Defines What Gets Built

    May 19, 2026 Data centers sit at the heart of the modern digital economy. Every AI query, cloud workload, streamed video, or online transaction depends on reliable, always-on infrastructure operating behind the scenes. As digital demand accelerates, data center development is expanding rapidly across North America, with the United States leading growth and Canada emerging Read More…