| |

NovaTech Automation Meets Growing Demand for Networking with Substation-Hardened Layer 2 Gigabit Ethernet Switches

February 12, 2025

NovaTech Automation Meets Growing Demand for Networking with Substation-Hardened Layer 2 Gigabit Ethernet Switches
NovaTech’s new HERMES 2000 is a robust network solution specifically designed to provide the performance, cybersecurity, and environmental demands of modern digital substations

NovaTech Automation is excited to announce the release of the Hermes 2000 series of utility-grade Layer 2 Ethernet switches, enabling NovaTech to deliver a broader array of digital substation solutions to its utility customers.

The Hermes 2000 Gigabit Ethernet switches feature 28 ports and meet IEC 61850-3 standards. Available in various configurations of copper and SFP ports and operating voltages, Hermes 2000 switches are designed for mounting in 19” racks.

NovaTech’s CEO, Conrad Oakey, expressed enthusiasm for the new products:
“The recent introduction and strong response to the Orion VX – the server-deployed version of our popular Orion OS for substation automation platform – highlighted a customer need and an opportunity to provide robust network solutions suitable for the performance, cybersecurity, and environmental demands of the modern digital substation – all backed by responsive service that our customers love. Hermes 2000 broadens the offering for NovaTech customers and expands our capabilities for turnkey system engineering solutions.”

At a time when the demand for robust, integrated communication and automation solutions in the energy sector is growing rapidly, NovaTech’s customer-centric culture promises to deliver powerful solutions that address the challenges of electric grid modernization.

More Information

NovaTech

Related Story

The Digital Substation: Thinking “Outside the Box” Could Play a Crucial Role in the Future of Substation Automation

The future of power system substations may be redefined by the application of virtualization. At least that is what an increasing number of utilities are envisioning as they explore the opportunity for increased virtualization in substation design. In this future, there would be a significant reduction in the hardware used in substations. Instead, tasks will be carried out on cloud servers, marking a noticeable shift from the current reliance on extensive racks of hardware.

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • Case Study: Optimizing Harmonic Mitigation in Wastewater Treatment

    June 22, 2026 Segment and Application In a municipality, wastewater treatment plants typically stand out as the main consumers of electricity. The operational processes exhibit significant load variations throughout a 24-hour cycle, necessitating the use of AC drives to regulate pumps, blowers, and other motorized equipment in response to fluctuating demand. In one wastewater treatment… Read More…

  • Why Do Mission-Critical Facilities Need Seismic-Rated Server Racks?

    June 17, 2026 When organizations think about seismic preparedness, they typically focus on buildings, backup generators, and emergency response plans. However, one critical component is often overlooked: the rack supporting the network infrastructure. For hospitals, emergency operations centers, municipal facilities, utilities, and public safety agencies, network connectivity is essential during and after a seismic event.… Read More…