| | |

HELUKABEL Places New Variations of their HELUPOWER® Solar Cables on the Market

September 30, 2024

HELUKABEL Places New Variations of their HELUPOWER® Solar Cables on the Market

An Even Larger Selection of solar cables for Operators of Photovoltaic Systems

New to the program is the HELUPOWER® SOLARFLEX®-X H1Z2Z2-K UL. With this product, HELUKABEL claims to be the first manufacturer to offer a solar cable constructed according to UL 4703, which is an important criterion for system manufacturers focused on exporting products to foreign markets, such as the USA. This solar cable is also suitable for worldwide export thanks to its DIN EN 50618 and IEC 62930 approvals. This helps optimize warehouse capacity and simplify procurement processes since only one cable needs to be kept in stock, instead of multiple variations.

Additionally, the HELUPOWER® SOLARFLEX®-X PREMIUM is being added to the product portfolio. This design is certified according to the TÜV 2 PfG 2750 and is suitable for use in floating photovoltaic systems, or floating solar farms. This solar cable has an especially long lifespan and is suitable for international use thanks to its DIN EN 50618 and IEC 62930 approvals. With this, HELUKABEL is incorporating another solution into their product range – one that is specifically designed for the booming floating photovoltaics market.

The SOLARFLEX®-X H1Z2Z2-K standard design has already proven itself to be a reliable wiring solution for photovoltaic systems in numerous applications. The cable is halogen free, flame retardant, and is also resistant to UV radiation, ozone, climate effects, and water, making it perfectly suitable for open-air use. This solar cable’s approval according to the European norm EN 50618 guarantees its reliability in the field.

The NTS variation of the SOLARFLEX® cable family, which comes with special rodent protection, is also available. This protection is in the form of a rust-resistant, stainless-steel mesh which covers 80 85% of the cable surface. This prevents mice, rats, weasels, or other rodents from causing disruptions or outages in photovoltaic systems without having to use any chemicals. Thanks to these new cable variations, operators can now find even more ideal solutions for their photovoltaic systems and benefit from HELUKABEL’s decades of experience in the connection technology industry.

Source

More Information

HELUKABEL

Related Story

HELUKABEL Group Builds New Facility for Automation Cable Solutions

The HELUKABEL Group, a global cable system solutions provider, announced it is going to build a new facility in Haan, Germany that will house its robotic dress pack and drag chain system subsidiaries under one roof. The new building will also serve as the headquarters of HELUKABEL’s Rhine-Ruhr sales branch, and is planned to be completed by 2025.

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • Why Cable Management Is Now a Core Category in Modern Rack Deployments

    July 17, 2026 As IT infrastructure continues to evolve, one thing has become increasingly clear: 👉 Cable management is no longer optional. It’s essential. What was once treated as an afterthought or accessory is now a critical component of any successful rack deployment. That’s why Hammond Manufacturing has made cable management a dedicated product category, designed to… Read More…

  • Cable Management Isn’t an Accessory. It’s Part of the Network.

    July 17, 2026 Cable management has a habit of becoming tomorrow’s problem. The rack gets installed, the switches are mounted, the patch panels are terminated, and before long the network is live. Everyone is focused on getting systems online and moving to the next job. The cables? They’ll get cleaned up later. Except “later” almost… Read More…