|

Weg Pamensky’s Toronto Office Moving to New Location

September 4, 2024

Weg Pamensky’s Toronto Office Moving to New Location

Weg Pamensky’s Toronto Office Moving to New Location

Pamensky (WEG Canada) is proud to announce that they are moving to a new location! In August, their warehouse was relocated to a new facility with over 125,000 sq. ft of space, allowing them to serve you even better. The office will follow suit by the end of September. They continue to offer the largest inventory of industrial motors in Canada, with expanded services, including their motor modification shop and panel shop.

New Location is 175 Gordon Baker Road, Toronto ON, M2H 2N7

Warehouse – as of August 12

Offices – as of September 30

Source

Related Story

Drives and Controls Bimonthly Digest Archives

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • IPD Connectors: The Future of Tool-Free Power Distribution

    September 21, 2026 When it comes to reliable, efficient power distribution in challenging industrial environments, IPD (Installation Power Distribution) connectors represent a revolutionary leap forward in connectivity technology. At Proax, they understand that modern industrial installations demand solutions that combine speed, reliability, and versatility – exactly what IPD connectors deliver. As part of their comprehensive… Read More…

  • Active Load Sharing for DIN Rail Power Supplies

    September 15, 2026 When an industrial application requires more power than a single DIN rail power supply can deliver, connecting several units in parallel is an obvious solution. The technical challenge is to distribute the load evenly without compromising the output voltage. For more information on the parallel connection and redundancy of power supplies and… Read More…