Mitsubishi Electric to Build Net-Zero Energy Building Test Facility

April 11, 2019

Mitsubishi Electric Corporation announced some time ago that it plans to build a new test facility for its broad and integrated portfolio of technologies for net Zero Energy Buildings (ZEB) at its Information Technology R&D Center in Kamakura, Japan. The facility will accelerate the company’s development, evaluation and demonstration of ZEB technologies to meet the growing demand for buildings that combine comfort and superior energy savings. Mitsubishi Electric’s ZEB technologies are part of the company’s wide-ranging effort to help achieve the United Nation’s Sustainable Development Goals (SDGs). The new facility, which will cost approximately 3.6 billion yen, is scheduled to start operating in June 2020.

ZEBs maintain comfortable indoor conditions while considerably reducing annual energy consumption compared to conventional buildings by incorporating measures such as advanced heat insulation, solar shading, natural energy and high-efficiency equipment as well as on-site energy generation (photovoltaic power, etc.), as officially defined by the Ministry of Economy, Trade and Industry (METI). The new facility will examine all such systems, which generally enable ZEBs to generate all of their necessary primary energy to operate independently.

Mitsubishi Electric is helping to popularize ZEBs by providing planning and providing business-support services. The company registered with METI as an official ZEB planner in 2017. Going forward, Mitsubishi Electric aims to accelerate it development and application of ZEB technologies to contribute to higher energy savings and more comfortable living spaces. In addition, the company will contribute to more convenient office environments via its original ZEB+ concept.

ZEB TECHNOLOGY TEST FACILITY

Location 5-1-1 Ofuna, Kamakura City, Kanagawa Prefecture, Japan
(campus of Information Technology R&D Center, Mitsubishi Electric Corporation)
Building area About 2,000 m2
Floor area About 6,000 m2
Structure Four-story steel-frame
Start of operation June 2020
Investment Approximately 3.6 billion yen
(1.6 billion yen included for demonstration equipment)

 

Note that the releases are accurate at the time of publication but may be subject to change without notice.

For more information, visit HERE.

Related Articles



Editor’s Pick: Featured Article

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s u-control 2000: The Automation Controller

Weidmüller’s scalable engineering software, u-control 2000, adapts individually to your requirements. And, the u-control is powerful, compact and fully compatible with Weidmüller’s I/O system u-remote. This article looks at what makes u-control the heart of your automation.

Programmable logic controllers (PLCs) are one of the main components of any automated system. A typical control system has inputs, outputs, controllers (i.e., PLCs), and some type of human interaction with the system, a human machine interface (HMI), for example.

Read More



Latest Articles

  • Labeling Cables and Wires

    February 3, 2026 Choosing the right wire marker or cable label Cable and wire labeling is critical in the identification, assembly, and repair of electrical control panels, wire harnesses, and data/telecommunications systems. It is an upfront cost that saves time and labor expenses when changes or repairs need to occur to the systems you work Read More…

  • ITC 101: Understanding NEMA Ratings for Electrical Enclosures

    February 3, 2026 Understanding NEMA Ratings for Electrical Enclosures NEMA Ratings are an essential classification system used across North America to define the environmental and mechanical protection provided by electrical enclosures. Developed by the National Electrical Manufacturers Association (NEMA), these ratings help engineers, installers, and specifiers identify the appropriate enclosure type for industrial, commercial, and outdoor Read More…